TP1500 drilling operations never stop!
After the drilling operations of two wells were successfully completed, a new drilling operation in Mardin, has already started three weeks ago, and i...
After the drilling operations of two wells were successfully completed, a new drilling operation in Mardin, has already started three weeks ago, and i...
TPIC, TÜBİTAK, and Petrotek Global held the official closing meeting for the TP1500 Land Drilling Rig R&D project in Diyarbakir last month....
Recently Petrotek had an API audit and successfully concluded only with minor concerns.API stands for the American Petroleum Institute, which is...
A new 1250 HP, 17.000psi AF-1250 Acid Frac Pumping Unit has been delivered to the client this week. As per client specs, the unit is powered by a 1400...
Koca Yusuf's factory acceptance tests (FAT) were successfully completed on 03 November 2021. The tests were carried out in 2 stages in accordance w...
The design, supply, and manufacturing of our “National Modular 350 Ton Capacity Drilling Rig Design and Manufacturing”...
This website uses cookies to show the best performance. By using our site you accept cookies. See Cookie Policy for detailed information. Cookie Policy
Bu internet sitesi en iyi performansı gösterebilmek için çerezlerden faydalanmaktadır. Sitemizi kullanarak çerezleri kabul etmiş olursunuz. Detaylı bilgi için Çerez Politikasına bakınız. Çerez Politikası