
Factory acceptance tests for the second Hydraulic Catwalk to be delivered as part of the contract for 2 A/C Electric Drilling Rigs, TP1500 Sr2, were successfully completed on October 27, 2023. The tests were witnessed by the testing and acceptance commission appointed by our client, TPIC.