API Certification Complete
...
A 75 ton water drilling rig was designed and manufactured for a drilling project located in Somali State of Ethiopia. The rig was tested & deli...
Turkey's first "Local Modular 350 Tons Capacity Drilling Rig Design and Production" project meeting was held in Petrotek’s Konya Production F...
The demand for state of the art technology in the drilling equipment has dramatically increased owing to the t...
1 (one) Ideco 8 Workover Rig in TPIC’s inventory, which had received severe damage to its mast, was brought to Petrotek for repairs. It was d...
Turkey’s first acid fracturing unit has successfully completed all factory acceptance tests and been delivered to the client in July 2018....
This website uses cookies to show the best performance. By using our site you accept cookies. See Cookie Policy for detailed information. Cookie Policy
Bu internet sitesi en iyi performansı gösterebilmek için çerezlerden faydalanmaktadır. Sitemizi kullanarak çerezleri kabul etmiş olursunuz. Detaylı bilgi için Çerez Politikasına bakınız. Çerez Politikası